2011 Dec 20

Reconstruction of 110/35/10 kV transformer substation Rokiskis. End user Lesto, AB

In this project were build new modular building for substation’s control systems, two 15 MVA transformers were fixed. In the new building 10 and 35 kV switching equipment were mounted, lighting protection tower demounted.
2011 Dec 14

Factory Acceptance Tests of ABB RTU panels, Czech Republic

Aedilis, UAB Engineer participated in Factory Acceptance Test of ABB RTU560 panels in Czech Republic. These panels where designed and manufactured for substations in Kenya.
2011 Oct 10

Reconstruction of 110 kV transformer substation Griskonys. End user Litgrid, AB

Replacement works of 110 kV circuit breaker with switch completed in 110 kV transformer substation Griskonys. New equipment for relay protection and automation, RTU, telecommunications systems were provided.
2011 Sep 20

Reconstruction of 110/35/10 kV transformer substation Kedainiai. End user Lesto, AB

Two transformers and their foundations were fixed in this project. New switchgear for 10 kV and 35 kV were mounted, new room with RTU‘s, protection and telecommunications were built. This substation was integrated in regional SCADA system.
2011 Jul 18

Construction of 330 kV transmission substation Bitenai. End user Litgrid, AB

Construction of Bitėnai switchyard at the border with Kaliningrad was a strategic site for Lithuania. The switchyard is necessary for consumers in Western Lithuania to receive electricity through the grid located in Lithuania. So far power lines at Bitena
< 1234 >

Contact us

Search